« Archives on March 31, 2014

Pants.

7 hours.

Put the pants on, one leg at a time.   I’m about to head back into my regular work schedule, which means days will become weeks.   So a task that will take a couple of days, will become a couple of weeks, because I’ll only get to it on weekends.  And the fun part coming up:  Wet fiberglass!  But this is what I got done today:

People’s exhibit A:  The right side wheel pant with the intersection fairings test-fit.

 

IMG_1965

Left wheel pant.IMG_1966

 

IMG_1967

Getting there.   Today was all about installing the mounting hardware for the fairings  Since we did the tweaky measuring stuff on Friday, today was all about just putting everything together.   Lots of platenuts to replace the clecoes from the position-locking drill ops.   But it is actually pretty cool how sturdy these things become once they’re put together and installed.   They’d better be.   They’re going to get the crap beat out of them.

Next is the wet work.   The intersection fairings will have to be taped on, then have a couple of layups of glass put on them to thicken them and make them conform to the exact shape of the fuse, gear leg fairings, and wheel pants.  I’m still working out the best way to do this, but I think it’s a two-day job.   One side per day.    Then the whole kerbang comes apart and I take the parts home and paint them.