The List.

Sean moving out of the guest house avails me of two things. One is a place to live while we remodel our bedroom and have new windows put in. The second is a place to build an airplane. So here’s what has to be done to make it work. I’ll post photos of the guest house soon, but for now, bear with me.. It’s about a 500 sq/ft structure with a small attic, main room with vaulted ceilings and a small bedroom. The bedroom has been allocated as a true guest bedroom and our bedroom while we remodel and can’t use our master bedroom. It’s also a chillout space. The main room is party zone and aircraft factory. It’ll be a party zone until June when the kit shows up. Anyway here’s what has to be done before this can work.
1. Remove/relocate stove and fridge.
2. Remove cabinets.
3. Remove vinyl flooring in kitchenette and bathroom.
4. Remove carpeting throughout.
5. Remove baseboards throughout.
6. Tile (or concrete stain) bedroom and bathroom.
7. Concrete stain/floor seal main room.
8. Paint main room.
9. Install work lights in main room.
10. Build wing cradle.
11. Build fuselage stands.
12. Install shelving for parts.
13. Prepare attic for storage.
14. Finish Empennage (!!!!!!!)
16. Shrinkwrap and store finished empennage parts.
17. Upgrade electrical. 220v and an extra 30-40 amps.
Going to be a busy, busy May.

Comments (0)

› No comments yet.