Strip Tease

1 hours.
Yes, i know it’s only 1 hour, but “1 hours” will be easier to search later when I need to total up the time I’ve spent on this adventure.
I made the backing strips for the aft canopy section. To complete the aft canopy, I have to rivet the top skin on, which means I should probably install the static ports and tubing first, and maybe the conduit that goes from the tail all the way up to the cabin. I need to revisit my wiring run scheme at some point.

Comments (0)

› No comments yet.