2 hours
final-drilled the VS skin and took it apart for deburring/dimpling. Then it’s time to prime. Really need to get it together with the whole air line thing so I’m shooting dry, clean air. I have a special hose for paint, a 4-way regulator, and a filter. I am going to have to bite the bullet and set up air channels in the garage this weekend.
pics to follow.
« Archives in August, 2005
Drilled VS skin
VS skin on.
Clecoed the VS skin to the VS skeleton in preparation for drilling.
I already miss my .093 Burraway. Should have the VS ready for priming by the end of the week.
Here before you is the VS, clecoed together:
Finished VS prep
finished drilling and assembling VS skeleton. Now on to the skin, then we’re in primer hell.