Stainless Steel Providers.

5 hours.

Oh yeah, it was a good day. Not only did it not require the use of an AK-47, I got a lot of momentum going on firewall-forward wiring. The overall schematic is still rather nebulous, but it’s based more or less on Bob Nuckolls’s Aeroelectric Connection, drawing Z11. In this scenario, there’s a main bus, an endurance bus, and a small always-hot bus. I’m toying with the idea of deleting the always-hot bus and just putting in a switch for the alternate e-bus feed because quite honestly, an always-hot bus is an excellent opportunity to drain every last molecular twitch out of an otherwise healthy battery.

Also, with the acquisition of a Garmin GNS430W, my avionics stack is now complete. EFIS, audio panel, transponder, nav/comm/gps, done. Good god, I’d love a cigarette right about now… But the upshot of this is that the the electrical picture is now complete. I have to provide power for these devices, plus the various other implements of flight, namely trim, strobes, lights, and autopilot servos. How does that work? Common wisdom is to start at the battery and work your way back. Instead, I ran loads for lighting and strobes, and today I ran starter and e-bus feed, and they’ll collide behind the panel in a Gotterdammerung of switchgear and fast-on tabs.

So the next step is, how to get the electrons from where they are to where they need to be? I had a few simple rules, gleaned from the Aeroelectric Connection and the mighty oracle of Van’s Air Force, to wit:

1. Thou shalt not run thy strobe cables alongside thy data cables.
2. Thou shalt not run thy data cables alongside thy power wires
3. Thou shalt provide ample room to service thy components after the holy top deck skin is on.
4. Thou shalt not run thy wires below tubes which carry fuel, for the drips from leaks onto that which arcs may beget the inferno.
5. Thou shalt not allow breath or light to pass between cabin and engine compartment.
6. Thou shalt not expose thy wires to sharp metal edges.

The first step was to figure out where to make holes in the firewall for pass-through of electrical cable and sensor data.


A little off from my original guesstimate, but this’ll do.  A 1-inch hole accommodates the SafeAir1 firewall Passthrough, a stainless steel gizmowith a rounded outlet to let wires exit in any direction without chafing on one side, and get sealed with fireproof tape and goop on the other.


After a little cleanup, it looks OK.


My original estimate for the size of the MGL RDAC engine monitor module was way off, and MGL doesn’t actually publish the dimensions of the unit in the installation guide, which is problematic. So I scoured the newly-minted mglavionicsusers.org forum and found the answer I needed, then made this ghetto-ass mockup from the battery box packaging and a roll of blue masking tape.  This made me reconsider the location for the data wire hole.   In theory, there should only be one data wire going aft, that of the RDAC itself.   All the engine probes and sensors should go from the engine to the RDAC.


How do you make a meal out of stainless steel?   Chew slowly.   Everybody gets all weird about stainless steel, and true, it’s a whore to work with, but remember, if you can scratch it, you can cut it.   This is a 1″ hole saw, about three bucks from B&B hardware.  The trick is to dunk the end of it in Boelube and go SLOWLY.   Make your pilot hole with a #40, then move up to 1/4″, which is the size of the hole saw’s pilot bit.   This one’s so dull it won’t go through warm cheese, but it serves as a good guide for the hole saw.   Then, if the teeth of the hole saw are sharp at all, you should be able to grind your way through the firewall fairly easily.   Keep it from heating up.  If it starts to smoke, put more Boelube on it.    The amazing torque of this Makita cordless drill is also helpful.  It’s relentless.   If you’re working above the battery, cover the battery with a sheet of plastic or something.    You don’t want stainless steel chips grinding away between your battery and the firewall.


For added fireproofing, I used a bead of my leftover Fire Barrier 2000 around the FPT (firewall pass through) flange, just to seal the deal.  Not that it’s very necessary; you get pretty much an airtight lock when the two halves are screwed together with the firewall between them.

And there you have it.   Starter load wire, main bus feed, and e-bus feed, all going through the firewall just like they’re supposed to.  What this photo doesn’t show is the firesleeve I forgot to put on the outside of the FPT before I ran the wires through it. It also doesn’t show the master contactor load wire I put in shortly after.  I put the fire sleeve on and clamped it down with one of the hose clamps provided in the kit.

Since I was feeling inordinately proud of myself, I figured I throw the engine mount isolators on there.   Still not sure how they go, I’ll have to check, but the red bolt protection nipples are a nice touch.

Up in the corner next to the VA-168 manifold, you can see the second FPT.   This will carry a data cable from the RDAC back to the EFIS, with room for future additions should I wish to take my life in my hands with some sort of electronic ignition.

And here I am, sitting in the focus of the Dynafocal brainprobe.   Maybe I can infuse it with some of my own sentience, such as it is.

I just got off the phone with my cousin, Navy SEAL and former SDV electronics tech, who assures me, despite my misgivings, that the switchgear on the panel and the power routing is not a problem.   Nor is anything else.  Where it gets tricky is the audio wiring, where impedances must be matched and other arcane spells must be cast.   I’m going to bring him out here from Yuma for the hard stuff, I think.

Brake lines done.

2 hours.

I finished the brake lines. I have pictures, but I can’t upload them because my VPS server keeps denying me ssh and ftp access. Something is whacked. Maybe they’re updating them or something. Anyway, more electrical plotting, planning, and pondering. At some point I’ll upload my wiring schematic and let you all tear me a new one in the comments.

Update: Here are some pics:


Left side gear. The plans actually do say to use electrical tape. Under the tape is some 1/4″ plastic tubing, cut down one side and snapped around the aluminum brake line.


During landing, the gear legs flex quite a bit, in 3 axes. Not only that, the brake caliper moves in and out relative to the wheel. The spiral tube wrapping allows for this movement.


Right side done the same way.


Brake lines attach to the fittings through the firewall to the master cylinders.

On. The. Gear!

10 hours.

Over a couple of days that is. This week I tucked into wiring. I had to drill some new grommet holes in the baggage bulkhead on each side so I could slip some fat strobe wires up one side, and some fat RG400 coaxial cable down the other. Performing this task is difficult. I don’t have a large drill bit that screws into my 90 degree drill, so I had to make do with a countersink. A countersink can, in a pinch, be used as a drill bit. Drill your 1/8″ pilot hole, then push the countersink all the way through. Hole gonna need some cleanup, but that’s OK. I finished up running the strobe and coax for the ELT and tail strobe, along with power wires, then ran two lengths of RG400 cable aft for the GPS antennae up the left side after making a couple of new holes in the baggage bulkhead for some grommets.. This should take care of the eventual two GPS’s, the one in the MGL Odyssey and the one in the GNS430W. Yes, I’m going to get a GNS430W, because it contains 3 pieces of very necessary equipment in one box. On the other side, I ran two high voltage strobe cables and the strobe powerpack and tail light power wires.

I had some leftover coaxial so I ran it through the spar to a spot picked out for the COMM antenna on the left side under the seat panel. When the new load of coax comes in I’ll run the wire for the transponder antenna and reserve a healthy length of wire for the run down the left wing to the Archer antenna.

Not much to look at right now, but this will eventually get cleaned up, fully routed, and fully dressed.

But the fanfrakkingtastic thing is this:
I got the plane on the landing gear today!

To do this, I rolled out my trusty engine hoist.

It’s hard to take a self-portrait with an iPhone 3G, but this is me, positioning the hoist in order to lift the ship high enough to get the gear leg into the tube on the engine mount.


Lifted off the ground with one gear leg on. Judge me by my size, do you?


The plane supported only by its own landing gear.


From the side…

So now I have to cut a couple more holes in the firewall for electrical goodies, but the good part is, I’ve got a rolling airframe on which to hang the engine, which should be done soon. On the down side, it’ll be harder to get in and out, so I’ll have to come up with some kind of platform to make that easier. I have to go back down the Jeffries Tube a couple of times to clean up some wiring, but not too much work back there. Next is running battery and alternator cables, figuring out the wiring busses, actually choosing switchgear, and finalizing the panel design.

The Jeffries Tube.

3 hours.

In Star Trek, the Jeffries Tube (named after a member of the original series’ production crew) is a long, narrow tunnel from the engine room to the warp drive nacelles of the USS Enterprise. On the RV-7, it’s the space behind the baggage compartment going all the way down the tailcone to the 3rd-to-last bulkhead. Working down there really does make wish such things as aircraft elves existed. Unfortunately, they don’t, so I had to crawl down the Jeffries Tube to drill holes in bulkheads for wiring grommets, carrying a big cordless drill, a bit for the pilot hole, a bit for the grommets, a deburring tool, and the grommets themselves. I was able to get the grommets in and start the wiring run for the strobe cable and tail light power wire. It’s a slow process, and being mildly claustrophobic and crammed into a metal tube reminded me of my recent unsettling, yet action-packed U-boat dreams. I’m going to be spending a lot of time down there. I also have to drill grommet holes for the ELT coaxial cable and set up the wire stays for everything. I’m trying to avoid drilling more holes in the longerons and j-stringers, but I do have some adhesive-backed cable tie holders that will need to be placed.

As an aside, I finished the lower empennage fairing. These two stupid pieces of metal are supposed to have a rubber seal on them, but there’s no way that’s going to fit. Also, there’s no point in making these things removable, so I riveted them on. So now I have a 1/16 to 1/32 gap along the horizontal stabilizer at the root. So I lose a knot. Big deal. If it concerns me later, I’ll create a proper fiberglass lower fairing. Speaking of fiberglass, I got the empennage tips riveted on. they’ll need a coat of primer/paint, but they’re done.

Also, yesterday I got a call from Tim at Tim’s aircraft. My spam filter de-rezzed his pdf of the engine repair estimate, but I got a new one from him. Nearly eleven grand. Ouch. But now I have nitrided steel cylinders instead of that godawful cermichrome and it’s going back together as soon as the magnetos come back from the specialty shop. I just hope he doesn’t flinch at installing the AFP fuel injection system. But what that means, brothers and sisters, is that I’ll probably be hanging the engine in the not too distant future. At this point it’s now time to get down and dirty with the remaining amounts of money and see if there’s enough for avionics, remaining FWF, interior package, taxes, training, and hangar rental at my phase 1 airport.

More emp tips and the strobe head.

4 hours.

You know by now that fiberglass is not my favorite medium in which to create airborne works of art. Mostly it’s the mess, but the big minus is the cure time. I filled the ends of the empennage tips with foam, laid up some fiberglass on each side to stiffen it, then slathered on a nice frosting of micro. I had to take another run at the micro to fill the low spots, but this time I mixed it a little wet. Of course, this necessitates putting the pieces in a position that will allow the filler to flow out flat along the backside, like so:


This tree, cobbled together with clamps, tongue depressors, and scrap angle, allowed the filler to behave as if it was cast in a mold. There’s still a modicum of shaping after this, but these are nearly done.

But I had to do something else while this was curing, so I tackled the thing I know I have the resources for. A while back, I verified that the strobe unit worked. Now it was time to stick it in the plane. I’m going to worry about wire runs later, but I mounted it just behind the baggage comparment bulkhead on the passenger’s side. This is a fairly common location, and will do the job nicely. But I’m out of practice with metal. I went through three plates before I got one that fit right. There are two pieces of angle a little wider than the strobe head, fixed to the J-stringers between the longeron and the floor. Drilling them to the J-stringers was not fun, and neither was riveting them. But they did eventually go in. Here’s a shot of one of the angles clecoed in:

And this with everything assembled and riveted:

Foam arrived, finally.

1.5 hours.

Cut and glassed in the emp tip foam inserts. This damned foam took nearly a month for Aircraft Spruce to get it to my house. It was backordered, then backordered again, and I finally got it today. They sent me a 2×4′ sheet of it too, and I’m pretty sure I ordered a lot less of it. Oh well.

This was easy enough, cut out some foam bits that fill the shape of the fiberglass tips, closing them off to outside elements. Mostly. I applied fiberglass and foam with the tips clecoed on so when the resin dries, I can pull them off and the tips will stay the shape they where when clecoed on. A couple of layups on the inside of the foam block and some micro filler frosting on the outside and those will be done. Then I don’t have to see the empennage again for a while.

Since I had some resin in the pot, I used up all the rest of my cut scraps to glass in the Archer VOR antenna in the wingtip, something I’d been planning to do for a long time but never got around to it. I did two layups on that, which should be enough to hold it in place, it’s not structural, just something to keep the antenna from flopping around in the wingtip. Another thing done.

[Untitled]

4 hours.

Got the emp fairing done, or at least as done as it needs to be, for now. It needs paint, and maybe another round of micro, but it looks OK as far as I can tell. I had to install the elevators to figure out the control horn cutout, but smart-monkey was in charge instead of impulsive dumb-monkey and I got them perfect on the first try. I got the fairing countersunk, then got the platenuts installed on the VS and HS. Oh, and packing tape sucks. The packing tape I had on the aluminum to protect it from epoxy sticking there did its usual trick and ripped apart when I tried to take it off. A little bit of cajoling with the heat gun and making sure to stop and pull it all off evenly helped. Then I took the tail pieces off, but of course, I forgot to do the lower emp fairings, which I currently can’t find. Next time.

Grumble.

3 hours.

Aircraft Spruce, for some reason, has twice screwed up getting me my foam that I need to do the empennage tips. OK, fine, plenty of other stuff to do. Like the empennage fairing. This is a fiberglass piece that fits over the place where the tail section is bolted to the fuselage. In theory, you have to pop this on there, drill the holes you need to drill, and fill in whatever gaps are left with flox or some other structural filler. The problem arises when the fit sucks so bad the part looks like it belongs on a different airplane. The only recourse at this point is to start hacking up the fairing and making it fit. Fortunately, fiberglass lends itself very well to this. I had to excise a whole section where the curve of the fairing conflicted with the vertical stabilizer and threw the fit of the whole thing into the toilet. The other thing that had to be done was the part had to be split into two pieces at the front vertical curve. Now it fits. Oh, also, there’s a scribe line around the edges of this part that’s a guide for trimming away the excess. Wish I’d seen that before I started butchering the fairing. With the excess cut away, the fit might have been good enough to just fill the gaps along the edges. I’m tempted to order another fairing and start over. Either that or I’ve bought myself a good 10 extra hours of fumbling around with multiple layups and a crapload of sanding.

But I have to go out of town for five days on business, to rainy, possibly snowy Vancouver BC, so the next chance I get to mess with this thing will be next Monday.

Grumble.

I need five uninterrupted hours to do the glassing. I’m not going to get that.

More emp tips.

3 hours.

Not much today. I did the elevator tips, short of the wet work on the ends. I have to do the counterweight balances before I can rock those out. I’m in the middle of trimming the rudder bottom so it fits right on the flanges, but that’s not getting riveted until the connections are made for the strobe and pos light, and THAT’s not getting done until the light is installed. The rudder bottom will probably have to wait until just before the trip to the airport.

A piece from here, a piece from there…

1 hours.

Last night was one of those “what’s there to do in an hour” nights. Enough time to get something done, not enough time to make a big ol’ mess.



I got some 2″ hose clamps a couple of days ago, so I decided to finalize the cabin vent tubing. OK, as final as anything is on this project. The 2″ black tubing connects the NACA vents on the side to the SteinAir eyeballs at the panel. You twist them one way, air blows out. Twist them the other way, nothing. Just like the ones in airliners. I tested them, they both work and they dont’ seem to leak, but I need to check that. Cold drafts (draughts?) at altitude are bad, because they’re an annoyance that can make a flight suck for a non-rugged-individualist passenger.

After that, I trimmed and drilled the fiberglass tip for the vertical stabilizer. These need to be closed at the back end with some kind of filler, but I didn’t want to make a fiberglass/epoxy mess at 9pm on a weeknight. The crap part is, the filler needs to be put in place while the tip is in place, because there’s no other way to ensure the proper shape due to the tip’s flexing when not pinned down. The VS might have to come off for this, but before it does, I’ll drill the hole necessary for the tail and strobe wires.