Wing mating wrapup work

9 hours.

I’d say that only 7 hours was actual, tools-to-metal building. The rest of it was cleaning the shop, looking at plans, arranging parts, and various distractions. I’m also including Wednesday night, when David came over and helped me with the final wings-on/wings-off activities. We drilled the wing root fairings and the bottom skin, then pulled the wings off and moved the plane back into the guest house. Then I slacked off for two days while I took a break and watched bad movies.

Today, I got back on it and tried to get the wings into shape for more cold storage. Because I’m an idiot and didn’t attach the pitot and static fittings, the AN connectors slid up (down?) the tubing of the pitot and AOA into the pitot mast and got stuck there, with no way to wiggle them loose. I had to take the pitot tube off and shove the fittings down to the point where I could grab them and hook them up to the plastic tubing running down the wing. Of course, this demanded that I unclamp the plastic tubing from the Adel clamps attached to the bellcrank bracket to give it some slack. Finally, I got all that back together, ran my wires back down the conduit, and moved on.

I deburred and dimpled the wing root fairings, and deburred/dimpled/countersunk the wing roots. I also drilled all the holes for platenuts. I got all the platenuts done on the right wing, which was slow going on the forward edges because they went family style on the pro-seal. It also didn’t help that I drilled the fairing root holes a little too close to the root rib. I had to grind down some of the platenuts so they’d lay flat on the skin. But it’s all good, they’re all installed. I’ll do the left wing tomorrow, then they go back into the garage to await the trip to the airport. And some wiring. And some other stuff.

Comments (0)

› No comments yet.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.