« Archives on November 9, 2005

Some VS work.

2 hours
Since I had to wait for my AN426AD4-8’s and -9’s, I figured I could get some work done on the VS.
Cleaveland tools delivered me some much needed things, like a longeron yoke, a 4″ thin-nose yoke, and some flush squeezer sets, as well as the pop-rivet dimpler in 3/32 and 1/8 sizes. My squeezer is definitely a piece of work, and I need to hack off the safety so I can have better teasing action.
So I was able to get the VS drilled countersunk, and ready to rock. That’ll be next after I close out the HS.
I have some pix, can’t seem to ftp them to the site at the moment. Grr. pix as they become available.