2 hours.
Wings are ready for move to the hangar. Cleaned up/fastened some wiring, perma-mounted the flaps, switched the shop back into fuselage mode.
4 hours.
Wing skins are done! I reinstalled the flaps and got a strip of UHMW tape along the back of one, and I’ll do the other tomorrow. The other thing I have to do is find or refabricate the flap hinge pin fasteners. After that, I just have some minor wire tidying to do and the wings are done, done, done.