Things to finish wings

This is more of a checklist for me than a report of actual work done, but here’s what i need to do to finish the wings:
Seal/test fuel tanks
Install nav antenna in wingtip (on the way from AC Spruce)
Install nav/landing lights in wingtips (on the way from CreativAir)
Run power and antenna wires from wingtips through conduits to wing roots
Run pitot/AOA plumbing to wing root from pitot mast location (order this from SafeAir)
Make wingtip connectors for lights/antenna.
Figure out whether or not to close up the wings, and if so, install pitot/AOA mast and probe.
Once these things are done, I believe the wings are finished. Then I have to store them in the garage and build a wooden cage around them so they don’t get bashed by various comings and goings for laundry and yardwork. This can be done by a few 2×4’s framed outward from the wall and covered with a thin sheet of plywood.

Comments (0)

› No comments yet.