3 hours.
Not much today. I did the elevator tips, short of the wet work on the ends. I have to do the counterweight balances before I can rock those out. I’m in the middle of trimming the rudder bottom so it fits right on the flanges, but that’s not getting riveted until the connections are made for the strobe and pos light, and THAT’s not getting done until the light is installed. The rudder bottom will probably have to wait until just before the trip to the airport.
Comments (0)