1 hour.
I drilled out the steel platenuts on the AHRS mount and replaced them with the aluminum standoffs I ordered from McMaster Carr. Now there is no ferrous metal fastening the SP2 magnetometer to the ship. I also finished wiring the flap motor and switch, then wired the load side of the strobe head. I think I’m close to being able to take the panel out for paint, labeling, and avionics stack wiring. Once that’s done, I can do the stick wiring, I think.
Comments (0)