To Do: FWF

There are a LOT of fiddly things firewall-forward. I’m going to attempt to list all the things I can think of that need to be done here, but I’m sure I’ll miss a lot.

1. Secure spark plug wires at cylinders This is actually done. I’m listing it because it might change.

2. Secure probe wires. Not sure how to handle this Done

3. Wire engine sensors Done. Still need to do MAP tube, but that’s not a wire, so nyah.

4. Finish running alt air control cable.

5. Install breather tube

6. Finish securing main wire bundle

7. Seal airbox/filter interface

8. Get proper governor nuts/lock washers

9. Get governor spring.

10. RTV baffles.

Some of this might be post-airport. The pre-airport list is on a corkboard in the living room.

Comments (0)

› No comments yet.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.