more VS mounting prep

1 hours.
Drilled and deburred the up elevator stop. That should be the last thing standing in the way of mounting the VS, which might happen tomorrow. I’m dying to get the control column and push tube done so I can detach the emp and put it back in the attic, because this Tetris game I’m playing with the fuse, the engine, the benches, and the toolbox has gone on long enough. I also need to keep this project from brachiating into too many lines of work. Having ten things partially finished is not how I want to do this. I sleep better knowing things are done. I’ve already got the wings open with no servos, I’ve got the engine needing work and parts, and i’ve got the fuselage that needs to be brought up to a level where I can paint. This weekend is supposed to be warm, so I think I can prime the inside of the push tube if I move fast enough mounting the VS.